Kitchen renovation checklist
Opens in Tatask as a new task with all 50 steps. New to Tatask? It'll be waiting when you've signed up.
A kitchen renovation goes wrong most often in the gaps: an appliance that does not fit, a worktop ordered before the units are in, a final payment made before the snags are fixed. This checklist runs in the order the jobs depend on each other, from the brief and budget to snagging.
It does not give prices, timings or legal rules, because these vary by place and by job. Where it matters, the notes tell you what to ask and where to check. Copy it into Tatask and the phases are dated from today. Stretch the dates to match your own supplier lead times.
Be specific: too little worktop, poor lighting, awkward layout. This is what the new design has to fix.
Paste this into an AI assistant to turn your wishes into a one-page brief.
Prompt to copy
Help me write a one-page kitchen renovation brief. Ask me questions about how we cook, who uses the room, storage problems and must-haves, then summarise. Do not suggest prices or give legal advice.
Builders often find surprises once old units come out. Many people hold back a contingency; decide your own figure and keep it apart.
Moving services costs time and money. Keeping them where they are is the simplest way to protect the budget.
Structural changes, gas work and some electrical work have rules that vary by place. Ask your local council or building control, and check official guidance for your area.
Tell your insurer about major works, and if you rent or lease, get written permission from the landlord or freeholder first.
Include ceiling height and where pipes, the boiler and the consumer unit sit. Photograph each wall too.
Walk through making a meal in each one. The path between sink, hob and fridge matters more than the style.
Take your brief and measurements. Free design appointments are common, but ask before you go.
Confirm each fits the planned space and that your electrics and gas supply suit it.
Ask each firm for a written quote on the same scope so you can compare them fairly.
Paste this into an AI assistant to draft the request.
Prompt to copy
Write a short, polite email asking a kitchen fitter for a written quote. Say I have a brief and a drawn layout attached, and ask what is included, the start and finish dates, and what insurance they hold. Do not guess any prices. Leave details I have not given you as <blanks>.
Ask to see recent kitchens they have fitted, and speak to at least one past client.
Check the register that applies in your country, such as Gas Safe in the UK or your local licensing body.
Pay in stages tied to finished work, not all upfront. Say what happens if the job overruns.
Lead times vary, so ask each supplier for a confirmed date and book them to land just before fitting starts.
Compare model numbers, sizes, finishes and handing of doors before anything is paid for in full.
A kettle, microwave, a small hob or slow cooker and a washing-up bowl cover most weeks.
Ask your fitter whether they dispose of the old kitchen. Some charities collect usable units.
Take photos before anything is covered. Agree any extra work in writing before it starts.
Follow the plasterer's advice on drying time before painting.
Worktops are usually cut to a template after the base units are in, so allow a gap in the schedule.
Photograph each one. Open every door and drawer, run every tap and test every appliance.
Ask for the paperwork for any notifiable work and keep it with your house records.